    Canal Quarry Reclamation, Richmond, California

    These images were taken after the completion of excavation and compaction of approximately 134,000 cubic yards of fill material to construct an earth butress to stabilize and restore a hillside at the Canal Quarry. The work included excavation, fill placement and compaction, installation of rock anchors, installation of a stormwater drainage system, top soil placement, planting, installation of irrigation power supply and installation of erosion control materials.

    2008 Fill Slope

                     2008 Fill Slope                                  
    Restoration as of December 2010
    Rock Bolts after Planting

    Restoration as of December 2010 Rock Bolts after Planting
    Restoration Fill Slope April 2010Topple RepairToe of Slope Vmax Ditch Lining April 2010